Working with view
Today the construction of the incinerator finally started. First came the welder, well equipped. The painted metal parts were carried up by foot from the nearby metal dealer, so that construction of the roof could begin. After breakfast here also called lunch at 9:30 a.m. the bricklayer and helpers were on site and we started with the heart of the incinerator. After about 1.5 hours and a lot of adjustment the first layer was laid and the foundation stone for further precise work was laid. From now on, the workers themselves started to work with level, angle and tape measure. At the same time, the basic structure of the roof was created by itself. All in all, it was a very good start to the construction phase.
Text: Henning Risse